Pakistan Railways has finalizing a plan to procure 230 passenger coaches and 820 Capacity Wagons under the Public Sector Development Programme (PSDP) aiming help to improve the speed of the trains.
“Out of the total, around 46 Completely-Built-Up (CBU) passenger coaches have been procured up till now while the remaining 184 would be manufactured in the country and the couches would be able to travel at the speed of 160km/h,” said an official in the Ministry of Railways to state owned APP.
“Pakistan Railways is putting maximum efforts to complete rehabilitation and reconstruction work on the railway track along with improving the speed of the locomotives to carry passengers to their respective destinations on time,” he said.
The infrastructure, including the track and signaling system from Karachi to Peshawar, Main Line-I (ML-I), and doubling of track from Lahore to Peshawar (462.20 Km) was also being revamped, he added.
“The Computer Based Interlocking (CBI) system is installed on 48 stations of ML-I, to improve signaling and interlocking for higher speed and safety of train operation,” the official added.
The official said the employees were well cared for owing to having several welfare activities, including healthcare facilities through an intensive network of hospitals, dispensaries, and child healthcare units.